Some of the work that they are doing is:
1. Building a new food depot.
2. Building a roof over the propane storage area.
3. Building two more storage cupboards.
4. Building a library.
5. Repositioning three walls so that we can have three bigger classrooms.
6. Building a playground.
7. Putting in a couple of washrooms.
8. Building awnings over the windows.
9. Building a new wheelchair ramp.
10. Putting razor wire above the gate.
A lot of the wood for building depots and shelves. |
All the baggage that the team brought. |
Our new Makita drill set. Yeah team, thanks for bringing it. |
Gary installing shade cloth for the playground. |
Taking apart a platform for the new playground. |
Father son combo, what a team! |
Cutting pieces off, takes three. |
Gary teaching the difference between a Robertson and a Philips |
Drilling for tapcons. |
Securing the food depot to the floor. |
Daniel hard at work, loves the change of pace. |
Kevin teaching Frankilin how to use a skill saw. |
Trying to fix the welder! |
The shade clothe is almost done. |